Infrastructure
STEEL UDYOG KENDRA, with its commitment to serve
their clients with the best has physically large
infrastructure which includes 2 fully covered shed, overhead
cranes with machines and in-house weightment facility up to
40 m.t. along with the cut to length lines, the gulitone
shearing line and the slitting line.
It boosts itself of providing service of processing 10000 m.t. of material provided working to its full capacity.
It has a full expertise in the line along with for its
working and works for various companies who are
manufacturing engineering items and exporting and the work
that requires highly precision working. The machinery being
handled and operated by trained engineers and respective
technical teams gives the maximum best output.
